Packaging compliance.
Without the chase.
Bring fragmented packaging and supplier data into one connected workflow. Assess applicable PPWR requirements, generate traceable DoC drafts and see what is missing before sign-off. Resolve gaps, reassess and keep every declaration linked to its SKU, configuration and authorised review history.
See how PPWR worksBuilt for you. Not by you.
heio consolidates company uploads and supplier BOMs into structured Master Data, assesses the relevant packaging requirements and automatically builds EU declaration of conformity (DoC) drafts. Each draft stays traceable to its SKU and packaging configuration. Missing data is flagged with a clear owner and immediate notifications. Your team resolves the gaps, reassesses and routes the versioned draft to the assigned organisational signatory for authorised review and signing. Supplier HUB keeps contributions in the record—not in long email trails. The manufacturer retains legal responsibility.
Automated draft creation. Authorised review and signing. Your legal responsibility stays with you.

One structured packaging record
Consolidate fragmented uploads, material specifications and supplier BOMs in Master Data. Keep the source evidence attached to its product, packaging and supplier context, ready for assessment without rebuilding the record every time.
Missing data. Clear next steps.
See the gaps that prevent a draft from being complete. Assign each follow-up to the right team or supplier, notify them immediately and reassess the updated record before it moves to approval.
Every revision stays traceable
Link the DoC draft, assessment outcome and supporting evidence to the SKU and configuration they cover. Keep version history, review and authorised signing together, with a clear distinction between a generated draft and an approved declaration.
From BOM to DoC.
A high-level view of the journey. Structured data, clear gaps and accountable sign-off.
Experience it in a 30-minute demo- 01
Consolidate Master Data
Bring fragmented company records and bulk uploads into structured product, packaging and supplier records. Let suppliers contribute BOMs and evidence directly through Supplier HUB.
- 02
Assess the packaging
Assess each item against the applicable PPWR requirements, with the relevant SKU and packaging configuration in view. Keep the assessment outcome connected to the record.
- 03
Build DoC drafts
Automatically assemble reviewable declaration drafts from the structured record, with source evidence and packaging context attached. Draft creation is not approval; incomplete inputs remain visible.
- 04
Resolve gaps and reassess
Flag missing information, assign the follow-up and send an immediate notification to the responsible owner. Bring corrected inputs back into Master Data and reassess before approval.
- 05
Version, review and sign
Preserve version history and notify the assigned organisational signatory. An authorised person reviews and signs the completed draft; the manufacturer remains responsible for conformity and supporting evidence.
Missing information sends the record back for correction and reassessment—not straight to sign-off.
What’s missing.
Who owns the next step.
See missing BOM fields and evidence against the packaging record—not buried in an inbox. Assign the next action and route an immediate notification to the person responsible for review and signing.
Supplier material declaration
The draft’s packaging record flags the evidence gap. Correct the input and reassess before the DoC moves to approval.
EU declaration of conformity draft
Linked to its SKU, configuration, revision and evidence. After required gaps are resolved, the authorised signatory reviews and signs; the version history stays attached.
Example workflow only. No declaration is issued or signed by this website.
What applies.
What comes next.
Reviewed 19 November 2026.
Applicable rules depend on the product, packaging and market.
12 August 2026 · Requirements apply now
Regulation (EU) 2025/40 entered into force on 11 February 2025 and generally applies from 12 August 2026. Food-contact packaging at or above statutory PFAS limits cannot now be placed on the EU market. Current duties also include applicable reusable-packaging criteria, supplier information, manufacturer conformity assessment, technical documentation and EU DoCs, subject to scope and exceptions. Later requirements have separate start dates. [1][2]
28 October 2026 · Targeted derogations
Delegated Decision (EU) 2026/1948, published on 28 October, introduces a conditional crystal-glass derogation from heavy-metal limits until 31 December 2029. Decision (EU) 2026/429, adopted on 25 February, exempts specified pallet-wrapping and strap use from the 100% reuse requirements under Article 29(2)–(3), not the separate overall 40% target. Neither is a blanket exemption from PPWR. [3][4]
10 December 2025 · EPR change proposed
COM(2025) 982 proposes suspending Article 45(3) until 1 January 2035: the mandatory EPR representative requirement for EU-established producers supplying directly to end users in another Member State. The Commission still describes the proposal as under examination by Parliament and Council. It does not change current obligations, manufacturer DoC responsibility or the need for an authorised signatory. [5][6]
21 October 2026 · Further rules in preparation
The Commission opened a bio-based plastic-packaging consultation on 21 October, running until 13 January 2027; it informs a review, not an adopted content target. Its implementation page still lists harmonised labels and recycled-content calculation/verification, recycling sustainability and third-country equivalence measures as in preparation. The recycled-content acts’ 31 December 2026 statutory adoption deadlines are not evidence of adoption. [1][7][8]
Regulatory overview, not legal advice. Check the applicable text and transitional measures for your packaging or product.
Questions, answered.
Does every PPWR requirement apply now?
No. General application began on 12 August 2026, including food-contact PFAS limits and applicable manufacturer documentation duties. Harmonised sorting labels apply no earlier than 12 August 2028; major recyclability and recycled-content requirements phase in from 2030 or later, depending on the provision and secondary acts. Packaging type, operator role and exceptions matter.
What is generated—and who signs?
heio builds a draft EU DoC linked to the SKU, packaging configuration and revision. Missing information stays flagged for resolution and reassessment. An authorised person reviews and signs the completed draft; generation is not certification, and the manufacturer retains legal responsibility.
What happens when supplier data is missing?
The gap is flagged against the record and assigned to a clear owner, with immediate notifications. Suppliers can provide BOMs and supporting evidence directly through Supplier HUB. Updated information returns to Master Data for reassessment before the declaration moves to authorised approval.
Regulatory sources & scope
Status checked against opened official sources as of 19 November 2026. The Commission still describes labelling and recycled-content secondary acts as preparatory; final adoption, Official Journal publication and exact rollout dates were not established. Statutory act-adoption deadlines are not evidence that acts exist.
The EPR proposal status follows the Commission’s current overview, which describes examination by Parliament and Council. A final adopted amendment was not verified; the proposed suspension is not presented as applicable law.
Applicability depends on packaging, operator role, placement-on-market timing, exceptions and other relevant legislation. This package is marketing content, not an exhaustive legal assessment or a guarantee of compliance.
